guides · Method

What a demolition method statement has to write down

8 min · reviewed 2026-09-10 by RazeForce office (Product review) · educational — not a certificate · not legal advice

Searchers want a demolition method statement they can put in a job folder. This is not a template for every country. It is the list of things that, if missing, make the folder folklore.

Write these, or do not claim you have a method

  • What is being taken down, and what stays.
  • Sequence in order (including make-safe, and any removal of fittings before structure).
  • What is known vs assumed (size, mix, hidden tanks, possible asbestos).
  • Written proof that power and services are made safe — or the job does not start.
  • Neighbour vibration limit if anyone is next door.
  • Who can stop the job, and on what signal.
  • Where arisings go (dump, scrap, crush) with a basis for the cost.

What we will not write for you

  • Charge, burden, spacing, or cut design.
  • A public Run-simulation that pretends to be a method.
  • A certificate. Training Shift is teaching. DemSim is a study we run with you.

How this sits with RazeForce

RazeForce holds the day’s plan. DemDesk holds the folder. DemTools cites measurements. DemSim, if commissioned, is advisory language for your statement — not the statement itself.

Not legal advice. Your place has its own forms and named people. Use them.

RazeForce practice language. Not a law, not IS / BS / OSHA text, not a certificate. Follow the named people and the rules where you work. We never design the charge, spacing, or the cut.

Try the call on a plot: Game · Learn. Then the field note: Products.

Reviewed 2026-09-10 by RazeForce office (Product review). Cite this URL.

WhatsApp when the note isn’t enough · [email protected]
WhatsApp